Tingstad tunnel
ITS and tunnels
Gothenburg, SWEDEN
Trafikverket
2021-2024

The Swedish Transport Administration (Trafikverket) has entrusted SICE with the complete renovation of the technical systems of the Tingstad tunnel. This 455-metre long tunnel was opened to traffic in 1968 and is now the main passage under the Göta River in the city, with an estimated daily traffic of 120,000 vehicles. The scope assigned to SICE includes the design, supply, testing, installation, commissioning and maintenance of all technical tunnel systems.

Remodelling project of all the Electromechanical and Instrumentation, Control & Automation Systems of the tunnel: Tunnel Ventilation System and Evacuation Gallery Pressurisation; Lighting System/Smart Lighting Control System; Pressurised Water System for Fire Extinguishing; Air-conditioning and Ventilation of Technical Rooms; CCTV and AID; Fire Detection and Alarm; Environmental Detection Sensors; Telephony; Emergency Posts; SCADA.

This initiative involves the added complexity that the tunnel is in operation, as at least one of the tubes will be kept open to traffic during the works. The project began in April 2021; the first tube opened to traffic in April 2023, and the scheduled opening date for the complete tunnel is May 2024.

Choose language
Elige idioma