This project includes the on-board equipment, rail and road equipment for the 4.2 km tram line with 9 stops, 2 stations and 12 Translohr-Alstom trams on tyres and guideway.
SICE’s scope for the project includes the design, supply, installation, commissioning and testing of the tram signalling, traffic lights, including the tram priority system, the broadband wireless network, the driver assistance system and the technological renovation of the control centre.