Integrated control and supervision system for all the proposed facilities (La Almozara WWTP [34,560 m3/day], Alfocea WWTP [40 m3/day], three wastewater pumping stations and the Water Recovery Plant that collects the wastewater generated during drinking water treatment at the DWTP. The project includes the replacement of the controllers, as well as communications and information exchange between the plants and the Control Centre at Ecociudad and the Control Centre at the Almozara WWTP.