Choose language
Search
Radial 2 Toll Collection (Madrid)
Tolls and payment methods
Madrid, SPAIN
HENARSA
2001-2003

Mixed toll system with closed toll sections and open toll sections for the two 62-km long sections of the Radial 2 motorway and the ITS system of the R2 and assigned section of the M50. SICE carried out the design, supply, installation and commissioning of the toll system for 8 toll stations with a total of 117 lanes, 85 closed toll collection lanes and 32 open toll lanes, as well as the TAG collection system on the motorway.

Choose language
Elige idioma