The contract for the operation and maintenance of the Navarre Road Maintenance Control Centre and the systems and installations that depend on it covers the work required for the permanent supervision of the Control Centre, the management of incidents occurring on the Navarre Road Network, preventive maintenance and the replacement or substitution of the various installations that depend on it. In addition, SICE replaced all local control equipment and migrated the tunnel management system to a new open control platform.