The Champlain Bridge is one of Canada’s busiest bridges, but when it reached the end of its useful life, a new bridge had to be built over the St. Lawrence River, one of the largest infrastructure projects in North America at almost 3.4 km in length. SICE Canada was responsible for the design, supply, installation, testing, commissioning and two-year warranty of the ITS system.