Installation and maintenance service of the security systems of all Metro installations for 10 years. (12 lines and 247 stations)
The project includes the renovation of the fixed communications network, CCTV system in stations and trains, WIFI communications with trains in stations and tunnels, access control and security, centralised station control and 6 line safety control centres.