The JNET project includes the construction of 20.6 kilometres of new track, 53 stations and a depot. The new green line uses the existing red line for a stretch of 6.8 km. The contract also includes 114 new trams and the renovation of 46 existing units. SICE’s scope for this project also includes the supply of a powerful IP/MPLS communications network, a cybersecurity solution, a physical security solution and a control centre.