Choose language
Search

SICE is selected as preferred bidder for the 365 Toll Collection System Installation, Integration and Maintenance in Texas

SICE is selected as preferred bidder for the 365 Toll Collection System Installation, Integration and Maintenance in Texas

Following the successful implementation of SICE’s multi-lane free-flow toll collection systems on the State Highway 288 Express Lanes in Houston, and in Toll 49 around Tyler, the Hidalgo County Regional Mobility Authority (HCRMA) has selected SICE as preferred bidder to be Toll Systems Integrator for the final design, install, test, implement, operate, and maintain a Toll Collection System (TCS) to support the 365 Toll Project.

The project includes the implementation of multi lane free flow Roadside Equipment (RSE), the Project Host Server (Operational Back-Office), as well as the implementation of a Maintenance On-Line Management System (MOMS). The project also includes the operation and maintenance of the system, including image review services until the end of 2030.

With this project, the third one in Texas, SICE consolidates his position in USA as a multi-lane free-flow tolling solution provider.

Compartir contenido

Ellie

Choose language
Elige idioma