SICE tackled the project for the renovation of the Toll System, Civil Engineering and supply of communications infrastructure in record time, as well as the ITS System on the Golfo Centro Motorway for MRO Golfo Centro (private operator). The project included the design, supply, installation, testing and commissioning of the three levels of the Toll System (133 Lanes, 7 Toll Plazas and 3 Control Centres with Operational Back-Office and Commercial Back-Office).